Location – Retford, Nottinghamshire
Main Contractor – Henry Brothers
Contract Value – £3m
Duration – 52 Weeks
Description of Works: We have replaced the existing bore hole pump at a depth of 108m in the existing borehole, complete with CCTV surveys and new sinewave filter installed within the pump house. Following these works we have had the existing tanks cleaned, disinfected and refilled.
The borehole pump will be supplying the existing tanks through a chemical dosing system (By Others) then it will be used for the potable water to the main Hospital